Projects

Projects

toos image

Supply & delivery of consumables and tools
Panauti Hydro Power Station, NEA — February 2026

Lowest evaluated responsive bid for supply and delivery of consumables and tools at PHPS. Contract awarded under open competitive bidding.
IFB: NEA-PHPS-2082/83-EMT-001
3 cpcb iv+25 58.5 kva

82.5 KVA Kirloskar generator supply & installation USAID Tayar Nepal / DAI Global LLC — March 2020

Supply and installation of 82.5 KVA Kirloskar generator at Manbhawan, Lalitpur for the USAID Improved Disaster Risk Management Project. Client confirmed satisfaction with generator performance and service quality.

USAID Tayar Nepal — Manbhawan, Lalitpur

industrial compressor uses

Air compressor supply, installation & commissioning Devighat Hydro Power Station, NEA — 2021

Supply, delivery, installation, testing and commissioning of two sets of COMPTECH brand air compressors (Model 115T and 115T2). Goods found satisfactory by station chief.
 NEA-DHPS-2077/78-MST-03
mitsubishi

L200 Mitsubishi vehicle spare parts (4 contracts) - Upper Trishuli 3A HPS, NEA — 2022/23

Supply and delivery of steering system, 4WD system, differential system and braking system components for L200 Mitsubishi Double-cab pick-up vehicles.
UT3AHPS-2078/079-MS-SQ-02/03/04/05

Other Projects

Supply & delivery of consumables and tools- Panauti Hydro Power Station, NEA — February 2026

Lowest evaluated responsive bid for supply and delivery of consumables and tools at PHPS. Contract awarded under open competitive bidding.
 NEA-PHPS-2082/83-EMT-001

Mechanical consumables supply & delivery -Upper Trishuli 3A HPS, NEA — 2022

Supply and delivery of mechanical consumables completed on time and within BOQ volume with quality conforming to standard bid document. Client issued formal letter of recommendation.
Bid Ref: UT3AHPS-2078/079-MS-T-04

Electrical consumables & submersible pumps - Upper Trishuli 3A HPS, NEA — December 2022

Two concurrent contracts: (1) Supply & delivery of electrical consumables, and (2) Supply, delivery and testing of submersible pumps with control panels. Both completed within the contract delivery period. Supplied materials conform to BOQ and technical requirements.
UT3AHPS-2077/078-ES-SQ-01  |  UT3AHPS-2078/079-EM-SQ-01